Dunsteel Blog

Keep up to date with all the latest news
105 Phillip St

105 Phillip St

105 PHILLIP ST: Throwback to an iconic project at 105 Phillip St where Dunsteel had the pleasure of working with Built. An amazing project and stellar effort by all the teams involved from suppliers, subcontractors to other trades on site. Dunsteel had the contract to...

read more
Welded Beams

Welded Beams

Another big heavy truss in the workshop using welded beams made in house #structuralsteel #madeinaustralia #sydneyconstruction P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Kaltenbach Install

Kaltenbach Install

The Installation of the new processing machinery from Kaltenbach is progressing nicely #dunsteelgroup #Kaltenbach #automation #steelfabrication P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Voco Hotel

Voco Hotel

See our linkedin update for the timelapse link: https://www.linkedin.com/feed/update/urn:li:activity:6755691459430633472 VOCO HOTEL: Construction of a feature stair to installation… Check the timelapse of the Voco Hotel stair we completed last year. It was fabricated...

read more
2021 Update

2021 Update

Full steam ahead for 2021, with shifts working in the factory right through the break. Now that the sites are opening up again its all hands on deck to get installation happening. Keep a lookout for our site progress photos. P: (02) 4869 4700...

read more
Bundanon Trust

Bundanon Trust

We have hit the ground running this year with great progress at Riversdale Masterplan Project for ADCO. We have now reached the lowest point of the valley standing our columns at over 15.2m tall. Access and weather have provided a challenge but we have been able to...

read more
Dunsteel Update

Dunsteel Update

We are about to remove our old Protoblast section blaster to make room for the fully integrated and automated Sprint 1504 from Geitart/Kaltenbach. If anyone is interested in getting a mechanical section blaster complete with infeed and outfeed cross transports, please...

read more
Dunsteel Update

Dunsteel Update

Bye Bye Belinda. Our drilling line "Belinda" is off to her new home at Infrabuild in their Wetherill Park distribution hub. She is making way for the Kaltenbach equipment coming soon. Not sure what he/ she will be called yet... P: (02) 4869 4700...

read more
Bundanon

Bundanon

Incredible project to be a part of Bundanon Trust ADCO Constructions. Fabrication and installation of the steelwork was completed by Dunsteel Group. This project has a very challenging terrain for install but an impressive final result, great work by the team. P: (02)...

read more
Dunsteel Update

Dunsteel Update

After a busy year more exiting things are happening while we are away. Our Ficep beamline is being removed to make way for our new Kaltenbach plant which will be a completely "hands off and lights out" piece of automation. Watch this space for updates as we tool up to...

read more
Dunsteel Extension

Dunsteel Extension

#9 overhead Gantry getting installed at Dunsteel Group this morning. P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Cambridge Hotel

Cambridge Hotel

Great result in the factory and on site yesterday with the complicated logistics and install of this 19 ton Tower Crane Grillage for Hutchinson Builders, starting with a program of only 1 week from shop drawing approval to install. To ensure no issues on site during...

read more
Australian Museum

Australian Museum

Australia Museum opened last week after being closed for 18 months for extensive renovations. Dunsteel Group were working with Kane Constructions Pty Ltd at the project on various structural steel elements, most notably the architectural main entrance stair case. The...

read more
UOW Molecular Horizons

UOW Molecular Horizons

  Dunsteel Group are proud to have worked alongside Richard Crookes Constructions on the UOW Molecular Horizons project which was recently awarded 2 MBA awards. Congratulations to all the teams at Richard Crookes Constructions, Dunsteel Group and the many other...

read more
Louis Vuitton

Louis Vuitton

  Congratulations Built. on this excellent achievement. Dunsteel Group were thrilled to be able to work again with the team. https://www.linkedin.com/posts/built-pty-ltd_were-proud-to-have-our-louis-vuitton-flagship-activity-6737481665033199616-c0Q2  ...

read more
Adina Grand

Adina Grand

  2 years after starting work at Adina Hotel in George St, Dunsteel have successfully completed our works. It was great to be working again with the team at TOGA. Its satisfying seeing the final results and the culmination of all the hard work by our team and all...

read more
Legion House

Legion House

LEGION HOUSE: Dunsteel were the proud Structural Steel supplier to Empire Facades for this amazing structure at Castlereagh St, Sydney. Its a 25m high 5 level stair and lift shaft clad in straight and curved glass. As always, but especially for this project, the...

read more
Pandanus

Pandanus

PANDANUS APARTMENTS: Looks like the Coreten we installed at Pandanus Apartments in Coffs Harbour back in 2016 is rusting nicely. P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Dunsteel Extension

Dunsteel Extension

Busy day here at Dunsteel Group. We got the concrete slab down for the shed extension we are doing to house our new "Lights Out" beam processing installation. P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Qualtrics

Qualtrics

Challenging but Fulfilling Dunsteel Group #qualtrics, FDC_Group - FDC Construction & Fitout #fabrication P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Carringbah

Carringbah

Impressive end result Mainbrace Constructions Pty Ltd, we were pleased to be a part of this project. P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Dunsteel Update

Dunsteel Update

  We are currently fabricating another 10t overhead crane for our factory expansion. This will bring the total to 9 overhead cranes. #manufacturing #dunsteelgroup # #engineering #construction P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Rosebay

Rosebay

  Rosebay with Ultra Building Co is almost complete now. We're currently finishing off the awnings for the East and West Penthouse apartments. The awnings consist of white structural steel support and a distinctive enamel frit pattern on the glass, plus a...

read more
Dunsteel Factory

Dunsteel Factory

The Robotic Total Station has been an invaluable tool for us, here we have been able to set out cast-in anchors for our factory extension with just a single operator. 64 anchors in 16 pier locations set out to perfection in 45 minutes. Another tool helping us deliver...

read more
Greenland

Greenland

Yet another staircase going through the factory, this one is going to end up rather high at Level 83 in Sydney's tallest residential tower, the Greenland Centre. #stairs #construction #sydneybuild P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
8 Parramatta Square

8 Parramatta Square

Dunsteel have been building two gantries for lifting the heavy materials at 8 Parramatta Square for Versatile Group which will enable them to move the stone and travertine around on the site and inside the building, and also will make install much easier. As part of...

read more
Built Project

Built Project

This switchback feature stair for @Built in #Sydney CBD will be completed within a couple of weeks. Fitout is progressing nicely and the strengthening support steel is yet to be completed which will support an incredible wrought iron handrail.   P: (02) 4869 4700...

read more
Rosebay

Rosebay

Glad to be involved on this project Adrian Sicari Ultra Building Co. The awnings are looking smart! https://www.linkedin.com/posts/adrian-sicari-48b89444_ultrabuildingco-activity-6721895316850909184-prPv P: (02) 4869 4700 E: estimator@dunsteel.com.au

read more
Dunsteel Extension

Dunsteel Extension

  Dunsteel is expanding… We are adding an additional 3000m2 of yard space and 800m2 of factory space, making a total of 9760m2 covered factory space once the extension is completed. Stay tuned for our updates P: (02) 4869 4700...

read more
Storage Works

Storage Works

The Storage Works Project for Richard Crookes Constructions is now completed, fully installed in less than 3 weeks. The works included construction and installation of the Structural Steel Framing and full permanent formwork to mezzanine for 1000m2 warehouse....

read more

Leading Steel Fabrication Engineers

Innovation | Commitment | Precision